Habulus Oasis Grove, Electronic City
RERA registered · Updated Nov 2026
Habulus Oasis Grove Highlights
- Habulus Oasis Grove (The O.G.), pre-launch, Electronic City Phase 1
- Near Wipro Gate, Maragondanahalli Road, Electronic City, South-East Bengaluru
- 2 BHK, 3 BHK and 3.5 BHK: 1,197–2,255 sq ft
- 10 acres; 5 towers, B+G+23 floors; 920 homes; Phase 1: Towers D and E
- 83% open space; no common walls; 100% Vastu
- 42,000 sq ft clubhouse; 90+ amenities
- RERA PRM/KA/RERA/1251/308/PR/070526/008630
- Handover promise Dec 2029; RERA possession Mar 2031
- Starting from ₹1.19 Cr* plus GST and other charges
Habulus Oasis Grove Electronic City Price
| Type | Super built-up | Carpet | Price |
|---|---|---|---|
| 2 BHK · 2 toilets | 1,197–1,270 sq ft | Updating soon | From ₹1.19 Cr* (1,270 sq ft) |
| 3 BHK · 2 toilets | 1,444–1,715 sq ft | Updating soon | From ₹1.49 Cr* (1,715 sq ft) |
| 3 BHK Supreme · 3 toilets | 1,863–2,010 sq ft | Updating soon | From ₹1.79 Cr* (2,010 sq ft) |
| 3.5 BHK · 4 toilets | 2,255 sq ft | Updating soon | Updating soon |
*Indicative pre-launch prices per the developer sheet, plus GST and other charges. Subject to change. Carpet areas: Updating soon.
propscour's Curation
RERA registered (PRM/KA/RERA/1251/308/PR/070526/008630)
Habulus: 11+ years, 35+ projects, 3 mn sq ft delivered
Pre-launch; RERA possession Mar 2031
Wipro, Infosys and Siemens campuses; Yellow Line Metro extension planned
10 acres, 5 towers, 83% open space
Wipro Gate 4 min; Elevated Expressway, NH-7, NICE Road
Verdict: Large-format 2 and 3 BHK homes in a low-density 10-acre community inside the Electronic City employment belt, suited to IT professionals who want to be close to work.
Pros
- 83% open space on 10 acres
- No common walls; 100% Vastu
- 42,000 sq ft clubhouse, 90+ amenities
- 4 min from Wipro Gate
Things to consider
- RERA possession only in Mar 2031
- Floor plans: Updating soon
- Metro extension is planned, not yet operational
Habulus Oasis Grove reviews
Reviews updating soon
Habulus Oasis Grove Electronic City floor plans
Habulus Oasis Grove price appreciation
Historical · Electronic City
Updating soon
Present · this project
From ₹1.19 Cr* (2 BHK)
Indicative pre-launch price, plus GST
Future · catalysts
- Planned 11 km Yellow Line Metro extension towards Hosur
- Satellite Town Ring Road and Peripheral Ring Road (planned)
- Elevated Expressway and NICE Road access
Past price trends don't guarantee future prices.
Habulus Oasis Grove Electronic City location and connectivity
Near Wipro Gate, Maragondanahalli Road, Electronic City Phase 1, Bengaluru, Karnataka
- Wipro Gate4 min
- Genpact0–5 min
- Velankani Tech Park0–5 min
- Treamis World School0–5 min
- Kauvery Hospital0–5 min
- Tech Mahindra5–10 min
- HCL Technologies5–10 min
- BTL Institute of Technology5–10 min
- Ramakrishna Smart Hospital5–10 min
- Biocon Park10–15 min
- SIBM10–15 min
- Candor International School10–15 min
- Edify School10–15 min
- Mazumdar Shaw Medical Center10–15 min
Times are approximate radius bands from the developer brochure.
Habulus Oasis Grove specifications
Structure
- RCC structure (MIVAN technology), Seismic Zone 2
- Ground floor double-height tower lobby and parking
- 2 basements for Towers 1 and 2; 1 basement for Towers 3, 4 and 5
Flooring
- Large-format vitrified tiles 600 x 1200 mm in living, dining, kitchen and other bedrooms
- Laminated wooden flooring in master bedroom
- Anti-skid ceramic tiles in balcony and utility
Doors and windows
- Engineered wood shutters with veneer finish and digital lock on main door
- 2.5-track glazed aluminium sliding windows with insect mesh
- Glass balcony railing with SS handrail
Bathrooms
- Wall-mounted EWC; Jaquar / American Standard or equivalent
- Rain shower in master toilet
- Concealed cistern; storage geysers in all toilets
Power and tech
- 100% backup for common areas; 3 kW (3B 3T) or 4 kW (3B 3T + maid) for apartments
- 100% AC VRV system provision
- Video door phone and digital door lock
- EV charging for 25% of units
- Solar water heating for top two floors
Safety and services
- Regenerative lifts with automatic rescue device
- Fire detection, sprinkler, water curtain and hydrant systems
- CCTV at campus entry and exit points
- STP, WTP and organic waste converter
Habulus Oasis Grove Electronic City amenities
- 42,000 sq ft clubhouse
- Swimming pool and kids’ pool
- Indoor gaming arena
- Gym
- Restaurant
- Toddler play area
- Outdoor amphitheatre
- Rock climbing wall
- Butterfly park
- Fruit orchard and organic vegetable garden
- Nature trail
- Yoga pods and meditation lawn
- Pickleball and tennis courts
- Cricket pitch and football court
- Skating rink
- Jogging track
- Dog park
- Treehouse
- Maze and sunken court
- Barbecue counter
- Fitness walkway
About Habulus
Habulus is a Bengaluru real estate developer with 11+ years of experience, 35+ projects and about 3 million sq ft delivered.
Habulus Oasis Grove (The O.G.) is marketed with Xanadu as mandate partner. RERA promoter entity per portal listings: Habulus Homes Pvt Ltd.
Habulus Oasis Grove Electronic City FAQs
Where is Habulus Oasis Grove?
Electronic City Phase 1, Bengaluru, near Wipro Gate on Maragondanahalli Road, about 4 minutes from Wipro Gate.
What is the price of Habulus Oasis Grove?
Indicative pre-launch pricing starts from ₹1.19 Cr* for a 1,270 sq ft 2 BHK, ₹1.49 Cr* for a 1,715 sq ft 3 BHK and ₹1.79 Cr* for a 2,010 sq ft 3 BHK, plus GST and other charges.
Is Habulus Oasis Grove RERA registered?
Yes. RERA No. PRM/KA/RERA/1251/308/PR/070526/008630. Promoter entity per portal listings: Habulus Homes Pvt Ltd. Possession: March 2031.
What are the configurations and sizes?
2 BHK (1,197–1,270 sq ft), 3 BHK (1,444–2,010 sq ft) and 3.5 BHK (2,255 sq ft).
When is possession?
Handover promise is Dec 2029; possession as per RERA is Mar 2031.
How big is the project?
10 acres with 5 towers (B+G+23), 920 homes and 83% open space. Phase 1 is Towers D and E.
How many floors and towers are there?
The project is a high-rise tower of basement + ground + 23 floors, as per the Habulus brochure.
Similar projects in Electronic City
Explore all Electronic City properties →Project details verified from the Habulus brochure (Drive) and Karnataka RERA registration PRM/KA/RERA/1251/308/PR/070526/008630 as of Nov 2026. *Indicative prices; portal listings show lower figures, brochure pricing used. Images are artistic impressions.






